Affiliations: GECO
Duration: 3 Years
Project Status: Ongoing
Description: In order to respond to respond to the evolving needs of the project as well as consultant specifications, Powertech delivered LV switchboards of 9000 A, as part of the synchronizing system. Key technical personnel were continuously involved in brainstorming to arrive at the final design and assembly of the switchboards measuring a considerable weight. Powertech proved its agility in responding to constant developments in design & scope and after deliveries.
"On behalf of GECO Mechanical & Electrical Ltd Sharjah UAE, I would like to testify that M/S Power Tech has been one of our trusted supplier as well as sub-contractor of Electrical equipments and Engineering services. Together, we successfully accomplished a number of projects to the entire satisfaction of our valued customers and still have a number of running projects. We believe that M/S Power Tech is a leading and reliable designer/manufacturer/assembler of advanced Electrical equipments and controls as well as professionally trained service providers in the field of electrical engineering."
Imtiaz MalikManager Projects Contracts Department
GECO Mech. & Electrical Division, United Arab Emirates