Affiliations: BK Gulf
Duration: 10 Months
Project Status: Completed in 2010
Description: Being a part of this iconic project got Powertech on fifth gear. In addition to the accelerated pace of the project, its dynamic nature in the constant evolution of the design and scope of work encouraged Powertech to achieve efficiency in fulfilling its time-bound commitments and the panel deliveries were made in time for the inaugural race. Powertech exceeded client expectation by providing on-hand support through the period of the first race.
"The remarkable success of the Mall of the Emirates extension project was to deliver high quality within a tight timeline. Powertech has contributed ably by delivering the gears on a fast-track basis."
Yousuf JamalBK Gulf, United Arab Emirates